Punjab and Haryana miss biomass utilisation targets despite deployment of 35,000 crop residue machines

CAQM's 2026 report card highlights shortfalls in biomass pellet and briquette utilisation in Punjab and Haryana, alongside gaps in paddy straw processing infrastructure.

Punjab and Haryana are falling short of their 2026 biomass pellet and briquette utilisation targets despite the deployment of more than 35,000 crop residue management machines across the region, according to the Commission for Air Quality Management (CAQM).

The CAQM’s State Action Plan-2026 Report Card, covering progress up to 31 October, classified both states’ performance in biomass pellet and briquette utilisation as unsatisfactory. Haryana achieved 35% of its target, while Punjab reached 53%, highlighting the gap between farm-level residue management infrastructure and the industrial utilisation of paddy straw.

Haryana achieved utilisation of approximately 6.88 lakh tonnes against its target of 19.66 lakh tonnes. Punjab recorded around 11.67 lakh tonnes against its target of 22.02 lakh tonnes.

The assessment comes despite significant deployment of crop residue management machinery. Haryana met its target for functional machines, with 13,700 deployed against a target of 9,000, while Punjab achieved 88% of its target, with 19,890 machines against a planned 22,500.

Ex-situ paddy straw utilisation remains below targets

The CAQM report also identified shortcomings in ex-situ paddy straw utilisation, which involves collecting and using crop residue outside agricultural fields rather than incorporating it into the soil.

Haryana utilised 15.54 lakh tonnes of paddy straw against its target of 27.10 lakh tonnes, achieving 57% of the planned quantity. Punjab utilised 54.62 lakh tonnes against a target of 78.07 lakh tonnes, reaching 70%.

Punjab, which generates a substantial volume of paddy residue, also recorded gaps in the infrastructure required to collect, store and process straw.

The state established 378 of its targeted 632 Custom Hiring Centres (CHCs), achieving around 60% of the target. These centres provide farmers access to machinery for crop residue management.

Progress in commissioning straw-processing plants was similarly limited. Punjab established 44 of the 72 targeted facilities, equivalent to approximately 61% of the planned number.

The figures indicate that the availability of farm machinery has not translated into sufficient industrial utilisation and processing capacity.

Industrial utilisation remains a challenge for biomass sector

Paddy straw can be processed into biomass pellets and briquettes for use as alternative fuels in industrial applications, including co-firing in thermal power plants and use in certain industrial boilers and brick kilns, subject to applicable fuel specifications and regulations.

However, effective utilisation requires a connected supply chain involving straw collection, baling, transportation, storage, processing and reliable demand from industrial consumers.

The gap identified by CAQM suggests that expanding machinery deployment alone is insufficient to ensure the commercial utilisation of agricultural residue. Processing infrastructure, logistics and sustained industrial demand are also necessary to move larger quantities of straw into productive use.

CAQM flags wider implementation gaps across NCR states

The report card also identified delays in several other pollution-control measures across Delhi and neighbouring states, including Haryana, Punjab, Rajasthan and Uttar Pradesh.

Municipal solid waste processing capacity increased by 2,256 tonnes per day (TPD) against a combined target of 8,447.76 TPD, representing approximately 27% achievement. Delhi recorded no additional capacity against its target of 650 TPD.

Legacy waste liquidation reached 90.49 lakh tonnes against a target of 156.67 lakh tonnes, or approximately 57.8%. Progress at several landfill sites remained uneven, including Ghazipur, Bhalswa and Okhla in Delhi and Bandhwari in Haryana.

The report also highlighted gaps in air quality monitoring infrastructure, industrial inspections, construction waste processing and public transport expansion.

Haryana had not installed any of the 23 targeted continuous ambient air quality monitoring stations by the reporting cut-off date. It had also made no progress towards the planned 115 TPD construction waste processing capacity.

CAQM has urged the state governments and Delhi administration to accelerate implementation ahead of the final assessment, scheduled for January 2027.

spot_imgspot_img

Subscribe to our Newsletter

Aditi Mishra
Aditi Mishra
Aditi Mishra is a India based writer and communications professional with a keen interest in bioenergy, sustainability, and the evolving climate landscape. With a background in journalism, marketing, content, and English literature, she brings a research-driven and editorial perspective to stories and conversations shaping the energy transition. Aditi closely follows developments across the bioenergy sector, exploring emerging technologies, industry trends, policy shifts, and the role of bioenergy in building a more sustainable energy future. As a climate enthusiast, she is particularly interested in making complex developments in the energy and climate space accessible, engaging, and meaningful to a wider audience.
Latest news
spot_img
Related news

LEAVE A REPLY

Please enter your comment!
Please enter your name here