Ecoboard Industries secures ₹9.90 crore CBG digester order from Sustain X Energy

Ecoboard Industries has received a ₹9.90 crore order from Sustain X Energy Private Limited for the design, manufacturing, supply and commissioning of a dry digester system for a compressed biogas plant. The contract is scheduled for execution within seven months.

Ecoboard Industries Limited has secured a ₹9.90 crore contract from Sustain X Energy Private Limited for a dry digester system for a compressed biogas (CBG) plant, covering design, procurement, manufacturing, supply, erection and commissioning.

The order, valued at ₹9,90,30,000, was received on 20 November 2026, according to a disclosure submitted to BSE on 21 November 2026. The company has stated that the contract is scheduled for execution within seven months.

The scope includes the complete delivery and installation of a dry digester system, from engineering and manufacturing through erection and commissioning of the equipment for the CBG facility.

Contract details and execution timeline

The order has been awarded by a domestic entity and will be executed in India. Ecoboard stated that the contract’s terms and conditions are covered under the letter of intent and the executed agreement.

The company also disclosed that its promoters, promoter group and group companies have no interest in Sustain X Energy. The contract does not fall under related-party transactions.

Ecoboard’s CBG technology and engineering business

The order forms part of Ecoboard Industries’ activity in the compressed biogas sector through its Ecoyou Energy division, which provides bio-digester solutions and associated engineering services.

Dry anaerobic digestion is used to process organic material with comparatively low moisture content under oxygen-free conditions, enabling the production of biogas. Depending on the plant’s configuration and gas treatment systems, the biogas can be upgraded to compressed biogas suitable for applications such as transport fuel or energy use.

Ecoboard describes its Ecoyou Energy division as an end-to-end solutions provider in the CBG sector and cites more than 40 years of engineering experience in bio-digester systems.

The order disclosure does not specify the plant’s location, feedstock, processing capacity, expected CBG output or a project-specific commissioning date beyond the stated seven-month execution period.

spot_imgspot_img

Subscribe to our Newsletter

Aditi Mishra
Aditi Mishra
Aditi Mishra is a India based writer and communications professional with a keen interest in bioenergy, sustainability, and the evolving climate landscape. With a background in journalism, marketing, content, and English literature, she brings a research-driven and editorial perspective to stories and conversations shaping the energy transition. Aditi closely follows developments across the bioenergy sector, exploring emerging technologies, industry trends, policy shifts, and the role of bioenergy in building a more sustainable energy future. As a climate enthusiast, she is particularly interested in making complex developments in the energy and climate space accessible, engaging, and meaningful to a wider audience.
Latest news
spot_img
Related news

LEAVE A REPLY

Please enter your comment!
Please enter your name here