Peñoles signs 20-year renewable energy agreement for 269 MW solar-plus-storage project in Mexico

Peñoles has signed a 20-year renewable energy supply agreement with Atlas Renewable Energy for a 269 MWp solar project with battery storage in Coahuila, Mexico. The facility is expected to supply approximately 550 GWh annually from the first half of 2029.

Mexican mining and metallurgical group Peñoles has signed a 20-year renewable energy supply agreement with Atlas Renewable Energy for a 269 MWp solar power project integrated with battery storage in Coahuila, Mexico.

The project is expected to supply approximately 550 GWh of electricity annually to support part of Peñoles’ power requirements at its operations in northern Mexico. Commercial operations are scheduled to begin in the first half of 2029, according to the companies’ announcement on 18 November 2026.

The agreement combines renewable electricity, battery storage, Clean Energy Certificates (CELs) and power capacity. The arrangement is intended to provide greater flexibility in managing electricity supply for Peñoles’ energy-intensive industrial operations while increasing the share of renewable energy in its electricity consumption.

Atlas to develop 269 MWp solar project with battery storage

The project will be located in Coahuila and will combine 269 MWp of solar generation capacity with a battery energy storage system.

The integrated system is expected to supply around 550 GWh annually under the 20-year agreement. The battery component is intended to improve the management of electricity supply and provide greater flexibility for an industrial consumer with continuous power requirements.

The companies have not disclosed the battery system’s individual power rating or storage capacity in megawatt-hours, nor have they announced the project’s investment value.

For Atlas Renewable Energy, the agreement represents its first renewable energy supply contract with a private-sector customer in Mexico. The company has previously developed projects in the country linked to the Federal Electricity Commission (CFE), including the operational Guajiro solar plant in Hidalgo, with 129 MWp of capacity, and La Pimienta facility in Campeche, with 445 MWp. Its Concepción Mendizábal project was also recently awarded under Mexico’s mixed-model scheme.

Renewable supply to support Peñoles’ decarbonisation strategy

The agreement forms part of Peñoles’ long-term strategy to increase renewable electricity consumption and strengthen the energy competitiveness of its mining and metallurgical operations.

According to the company’s 2025 Sustainability Report, renewable sources accounted for 49.9% of its electricity consumption during the year.

The new supply is estimated to avoid approximately 244,000 tonnes of carbon dioxide equivalent (CO₂e) annually, based on an emissions calculation using Mexico’s 2024 National Electric System emissions factor. This is an estimated avoided-emissions figure rather than a measurement of reductions already achieved.

The contracted supply also includes Clean Energy Certificates, known in Mexico as Certificados de Energía Limpia (CELs), alongside electricity and capacity provisions. These components form part of the long-term energy supply arrangement.

Atlas expands its private-sector renewable energy portfolio in Mexico

The agreement adds Peñoles to Atlas Renewable Energy’s portfolio of large industrial electricity consumers across Latin America, including companies in mining, metals, chemicals, cement and technology.

Atlas said the project will create opportunities for local employment and workforce training during its development and construction. The company also intends to support local supply chains in Coahuila.

Founded in 2017, Atlas Renewable Energy develops, finances, builds and operates utility-scale renewable energy infrastructure across Latin America. The company reported an asset base exceeding 10.8 GW in its announcement.

The Coahuila project will add solar generation and battery storage to Atlas’s Mexican portfolio while providing Peñoles with a long-term renewable electricity supply arrangement. Its planned commercial operation in the first half of 2029 will mark the next major milestone in the agreement.

spot_imgspot_img

Subscribe to our Newsletter

Aditi Mishra
Aditi Mishra
Aditi Mishra is a India based writer and communications professional with a keen interest in bioenergy, sustainability, and the evolving climate landscape. With a background in journalism, marketing, content, and English literature, she brings a research-driven and editorial perspective to stories and conversations shaping the energy transition. Aditi closely follows developments across the bioenergy sector, exploring emerging technologies, industry trends, policy shifts, and the role of bioenergy in building a more sustainable energy future. As a climate enthusiast, she is particularly interested in making complex developments in the energy and climate space accessible, engaging, and meaningful to a wider audience.
Latest news
spot_img
Related news

LEAVE A REPLY

Please enter your comment!
Please enter your name here